upgrade from 7.0.1-0 to 7.0.1-4

Environment : 32node cluster
Performing patch installation from 7.0.1-0 to 7.0.1-4 

Doubts :

1) Do i need to run the rpm package installation across all the 32 nodes ?
2) Similarly do i need to run install_vertica.sh  across all the nodes?

I am new to this vertica and this is first patch installation that i am performing so cross checking multiple times.

Thanks!
Sriharsha

Comments

Leave a Comment

BoldItalicStrikethroughOrdered listUnordered list
Emoji
Image
Align leftAlign centerAlign rightToggle HTML viewToggle full pageToggle lights
Drop image/file